Next:  
Up: Appnotes Index 
 Previous:4 Conclusions and Recommendations 
 
 
Anderson, A. H., G. A. Shaw, "Executable Requirements:  Opportunities and Impediments," ICASSP 1996   [ANDERSON_A96] 
 
Anderson, A. H., G. A. Shaw, and C. T. Sung, "Vhdl Executable Requirement," Proceedings 1st Annual RASSP Conference, Arlington, Va., August, 1994, pp 87 - 90.  [ANDERSON_A94] 
 
Benchmark 4 Consolidated Test Requirements, April 30, 1997. (Note: Under review for release approval.)
 
Hehner, Eric C. R., "Specifications, Programs, and Total Correctness," University of Toronto, January, 1997.  [paper not available]
 
 "RASSP Benchmark 4 Processor Requirements (Draft V0.5)," March 18, 1997.  [document not available, see  Gary Shaw for release]
 
RASSP Design For Testability (DFT) Methodology document, Version 1.0, Lockheed Martin Advanced Technology Laboratories, September 1995.  [METHODOLOGY_DFT95] 
 
RASSP DFT Summary Benchmark 3 (BM3) Shadow Program, Lockheed Martin Advanced Technology Laboratories, November 1997  [BM3_DFT_Shadow_97]  (Note: Under review for release approval.)
 
RASSP Methodology Document, Version 2.0, Volume 1, Lockheed Martin Advanced Technology Laboratories, October 1995.  [METHODOLOGY_95] 
 
Shaw, G. A., Anderson, A. H., and Anderson, J. C.,  "RASSP Benchmark 4 Technical Description," MIT Lincoln Laboratory, January 9, 1998   [BM4TD_98]
 
Thulen, M.,"A Case Study of the Application of Simulatable Specifications in the Design of Electronic Sustems,"  (CEENSS) Program, April 1998. [CEENSS] 
 
 
5.0 References
Anderson, A. H., G. A. Shaw, "Executable Requirements and Specification," Journal of VLSI Signal Processing 15 (1997).  [paper not available]
![]()
 
 
  
 Next:  
Up: Appnotes Index 
 Previous:4 Conclusions and Recommendations